4.6js_loader

Project Inspection Report

Customer Full Name(Required)
This is sent before job and sub has a purchase order from us.
Sprinklers, Landscaping, Other
Sprinklers, Roof Shingles, Deck Area, Walls Deck, Pavers Other
Exterior & Interior screws, trash and additional material removed & cleaned
Miters flush, scratches touched up, solar seal where aluminum touches structure. Super gutter no leaks
Fasteners flush with aluminum frame
Gaps in aluminum neatly filled with Solar Seal Selant, screw holes filled with screws not sealant No air gaps in framing - Cannot see "Daylight"
Installed & braced to deck
Hinges swing freely, bug sweep level, handle locks
If pool is present, Up to 2 areas copper bonding wire to exterior box is connected
Pool covered with plastic [during project only], no debris or screws in pool
Prepared By(Required)
Drop files here or
Max. file size: 25 MB.
    Upload Inspection Report images/video here Front, Left Side, Right Side, Roof, Video of entire structure 3 - 5 seconds
    Add G2G or Details of what needs attention
    4.6js_loader