The following Terms & Conditions outline the agreement between the parties as it relates to ScreenIT® Awesome LLC [Contractor] and client responsibilities, payment terms, and warranty information.
Table of Contents
Who We Are
ScreenIT® Awesome LLC is the Florida State Licensed General Contractor serving the entire state of Florida. Real crews & real people – we are the builders for your project.
Our Record
Since our inception in 2009, ScreenIT® has had:
Zero client project contract disputes
Zero workers’ compensation claims
Zero general liability claims
Zero Cage Failures with 2K plus jobs successfully completed
This record exists because we are the actual builder, we follow code, and we resolve issues directly.
Our Commitment
We are committed to 100% client satisfaction.
If you are not satisfied, Deborah (owner) is not satisfied either — and we take responsibility for addressing concerns promptly and professionally.
Florida State Certified General Contractor License #: CGC1535179
We design, permit, build, and warranty the work with in-house factory certified crews.
Your project is not referred, resold, or assigned to another company.
Preferred method of communication is via text at 239-301-0180. This is a team text system. A file link will be provided to you for all documents to be submitted to our team.
Contractor Responsibilities:
1.1 White Glove Treatment Permit Team Responsibilities & HOA Approval Coordination
- Weekly Updates via text
- The permit team manages all permit-related communication from deposit through final inspection, including:
- Surveys
- Drawings
- Sizes and dimensions
Status updates
Permit questions - Client-requested build date changes: up to 2 changes can be made without an extra charge.
- Client-requested build date changes: Must to be made at least 2 weeks in advance of build date scheduled
- Certificates of Insurance (COI), including:
- Insurance
- Liability: $2 Million
- Worker’s Compensation: $1 Million
- Client named as additional insured
- HOA named as additional insured (if applicable)
are ordered and provided by the permit team
- HOA named as additional insured (if applicable)
- If the HOA requires drawings:
- The permit team will provide required drawings or
The Client may use the approved 3D Design
- The permit team will provide required drawings or
- Permit team contact information will be provided within two (2) business days of payment of the initial deposit
- 3D Design
- Engineering
- Permitting Filing & Expediting
- Build Date Questions
1.2 Owner Handles Custom Build, Punchlist & Warranty of Project
- Demo of existing enclosure; if applicable
- Build Supervision
- Substantial Completion Quality Control Audit
- Final inspection
- Punchlist & Warranty
Client Responsibilities:
2.1 Client-Provided Documents
- Notarized Notice of Commencement; provided via contractor
- Signed Notice to Building Official (NTBO); provided via contractor
- Current boundary survey showing property setbacks
- HOA documentation if applicable
2.2 Client Approvals & Timelines
- Client will receive 3D design, engineering & final build dates for approval
- Written approval (email or text acceptable) is required:
- HOA Approval; if applicable
- Permit filing questions
- Build begin date
2.3 Progress Payments:
| Initial Deposit | $2,000, refundable until the permit is filed and credited toward the project total |
| Permit Filed | 45% project progress payment due |
| Substantial Completion | 45% project progress payment due |
| Final Inspection Pass | Remaining balance due |
Note: For security purposes, we cannot accept checks. Progress Payments are sent via secure payment link; credit card payments other than the initial deposit may be assessed a 3% processing fee.
2.4 Right of Refusal – Requirement by Florida State Law:
We are required by State law to provide this information for any contracts or terms & conditions:
YOU, THE BUYER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO
MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION.
See attached notice of cancellation for an explanation of this right. Customer
confirms receipt of two [2] copies of notice of cancellation.
2.5 Cancellation & Request for Deposit Refund
- From the 4th day until we file the permit application, usually about a week to 10 days, you are able to cancel the project and request a full refund. You can do so by texting 239-301-0180. With your first and last name, date of transaction, amount, and the words “CANCEL/REFUND.”
- Your refund will be processed, and payment will be sent using the payment method used for the deposit. It will be processed within 5 working days.
2.6 Communication & Escalation
- Primary communication is handled by the Permit and Client Success Team
- To escalate an urgent issue, the Client may text and ask to schedule a time with Deborah, and our Client Success Team will text her or put you on her calendar:
- Real people. Real accountability.
Success Team Text number: 239-301-0180
Other Responsibilities & Conditions
3.1 Safety
- During construction or demolition, only ScreenIT® employees are allowed within 15 feet of the construction area to avoid injury – this is an active jobsite. If you have any concerns, please text us immediately at 239-301-0180. Please do not distract the crew for safety reasons.
3.2 Materials and or Labor Increases:
- Material Price Increase: ScreenIT® shall be entitled to additional compensation from Client when the price of any materials increases by five percent (5%) or more.
- Material & Labor Price Increase: if the scope of work increases by five percent (5%) or more between the time the contract is signed and materials for the project are purchased.
- The contractor is required to demonstrate this price increase through the use of quotes, supplier list prices, invoice or receipts, when requested.
- All price changes will be documented with a written change order. Work may not proceed until the client has approved it in writing.
3.3 Delays Beyond Contractor Control
- Weather: rain, high winds, hurricanes, floods, or similar conditions that could cause crew danger
- Acts of God
- Material shortages
Government orders
Pandemics
3.4 Site Work, Footers, Deck Expansion & Municipal Requirements
If the project requires site work and it is determined by municipal permit departments any of the following are required:
- New or modified footer or relocation of utilities
- Changes impacting setbacks, drainage, or impervious area
- The cost of any new or updated survey and or additional engineered drainage plans or civil drawings required by the municipality (MUNI) [cost typically $500 each if necessary]
3.5 Access, Site Conditions & Cooperation
- Reasonable access to the job site, work area, electricity, and utilities
- Space for the delivery and removal of materials and debris
- Confirmation that existing surfaces are suitable
- Contractor not responsible for pre-existing conditions
3.6 Warranty
- Materials: 10 Year factory-direct warranty from the manufacturer on all materials
- Labor: 5 Year ScreenIT warranty
- Care Plan Details – https://screenitinc.com/care-plan
Warranty Claims or Punchlist Items may be submitted online at https://screenitinc.com/book-repair/ .
There is a small diagnostic fee charged for the inspection of the issue only. If it is found to be damaged, you will be alerted to any additional fee not covered by warranty in advance of service.
3.7 Scheduling & Delays
- Project timelines may be affected by factors outside Contractor control, including:
- Late submission of the client’s required documents for the permit
- Weather
- HOA review timelines; permitting can proceed with your approval while waiting for HOA approval. These are only an issue during new build or expansion projects.
- Municipal permit processing; while 20 days by law, during a natural disaster, they can overrule and say they need more time. Our permit team will keep you posted weekly.
- Material availability
- Acts of God
- If delays occur, schedules adjust accordingly, and you will be updated weekly.
3.8 Substantial Completion & Punch List
- Substantial completion occurs when the project is usable for its intended purpose
- Minor punch-list items with a value less than the final progress payment do not delay the substantial completion payment
- Punch-list items will be completed promptly
- Final payment due after: Punch-list completion & Successful municipal inspection
3.9 Arbitration & Governing Law
- If a dispute shall arise between CONTRACTOR and Client with respect to any matters or questions arising out of or relating to this Agreement or the breach thereof, such dispute, other than collection matters, shall be decided by arbitration administered by and in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association.
- Maximum contractor liability is 10% of the contract/bundle price.
- Final structural details are determined by engineering, not estimates, pricing tools, visuals, or 3D renderings.
- Required approvals must be completed before work begins.
- Governing Law; These Terms & Conditions are governed by the laws of the State of Florida.
Florida Certified General Contractor # CGC1535179 https://screenitinc.com/certifications/.
Insurance & License
Thank you for the opportunity and trust in ScreenIT®
– Deborah Frye, Owner/Queen of Awesome & The ScreenIT® Client Success Team
Client has read and understands this proposal, the terms and conditions, and all documents referenced therein and agrees to be bound by its terms. The above prices, specifications and conditions are hereby accepted. CONTRACTOR is authorized to do the work as specified in the bundle. By signing and or initialing below, Client acknowledges that Client is the owner, or is in privity with the owner of the property.
Schedule A: Package Detail
| Plan Name | Base |
|---|---|
| Story | 1 Story |
| Wind Code Level | Meets Local Minimum Required |
| Structural Aluminum Frame | Basic Aluminum frame extrusions factory powder coated colors bronze or white custom built & assembled to fit your house perfectly |
| Welded Reinforcement | ZERO Reinforcement |
| Open View Screen Walls | ZERO |
| Fasteners | Dreamlock™ Marine-grade stainless fasteners entire cage |
| Screen | Superscreen® Polyester the best screen insect grade any size mesh. Entire Cage. |
| Footer Beams | ConcealCap™: Footer Beauty Plate – Smooth finish – no visible screws |
| Doors | Standard Patio Doors 40 inch x 8FT QTY of 2 |
| Roof Height | SkyVault™ Raise Roof Top Up to 14FT- Expansive Design |
| Warranty | 5 YR Labor, 10 YR Factory Direct Materials |
| Structural Gutter | Dreamgutter™: 7 inch Super Gutter & Oversized Downspouts Plus Alumium Gutter Guard – NO MORE Overflowing Gutters |
Schedule B: Add-ons & limitations, if applicable
*Final sizes determined during engineering
**Enclosure price does not include site work or footer unless explicitly stated otherwise below:
See the brochure and welcome package for more information
ScreenIT® Dreamscape® SkyVault™ ConcealCap™ Dreamdoor™ Dreamglow™ Dreamlock™ Dreamview™
The use of these exclusive engineered systems by any unauthorized party is strictly prohibited and will be prosecuted.
